Full range in one container
Machines across nine equipment families on one invoice, one shipment.
Wired for Kenya
Voltage, frequency and phase set to your site before the machine ships.
Freight quoted to your port
FOB, CIF or door delivery, with the document set issued alongside the bill of lading.
Importing into Kenya
The four things that decide whether a machine bought from China actually works out.
The electrical spec matches your site
Rewiring after it lands costs more than the freight. Tell us 220V or 380V, 50Hz or 60Hz, single or three phase, and it is built that way.
The paperwork clears customs
Invoice, packing list, certificate of origin and fumigation certificate prepared for Kenya and issued with the bill of lading.
Parts are still available in year five
Standard motors, bearings and contactors are specified so your local supplier can replace them without importing anything.
You can inspect before it sails
Attend the run-off, join over video, or nominate SGS, BV or Intertek. The report ships with the documents either way.