Skip to main content
  • ChinaManufacturing base
  • 9Equipment families
  • OEMPrivate label welcome
  • Same dayQuotes on working days
  • FOBAny major Chinese port

Why importers buy direct from the plant

Eight things that decide whether a machine arrives right, on time and supportable.

Factory direct

You buy from the plant, so no trading margin sits on your landed cost.

Built to your specification

Send throughput, material, voltage and floor space. We size the machine to the job.

Checked before crating

Run-off test, finish and fit sampled against the approved reference unit.

Export papers handled

Invoice, packing list, certificate of origin and fumigation issued with the shipment.

OEM and private label

Your brand on the nameplate, your colours, your manual. Minimums are workable.

Quoted the same day

Price, lead time, packing details and port options back on the same working day.

Ships from any major port

Shanghai, Ningbo, Shenzhen, Qingdao or Guangzhou, whichever routes best for you.

Spares and support

Wear-part lists, installation drawings and video commissioning after delivery.

Why buyers reorder

Machines are bought once and judged for a decade. These are the four things that decide whether the second order comes.

Built to your output, not ours

Tell us throughput, voltage, and the material you are running. We size the machine to that, rather than shipping the nearest catalogue model and leaving you to adapt.

Tested under load before it ships

Every unit gets a run-off against the approved reference before crating. You can nominate a third-party inspector, or join the test over video.

Your brand on the machine

Nameplate, control-panel legends, manual and carton printed to your artwork. Proofs go out before production starts.

Parts still available in year five

Wear-part lists ship with the machine and stay stocked. Standard motors, bearings and contactors are specified so local replacements fit.

How an order runs

From the first email to a container on the water. No stage is a surprise.

Start an enquiry
  1. Tell us the job

    Model code or a description, plus throughput, voltage and your destination port. A photo of what you run now helps more than a spec sheet.

  2. Quotation and drawings

    Price, lead time, crated dimensions and weight, and a general-arrangement drawing so you can check it fits your floor.

  3. Sign off branding and voltage

    Nameplate artwork, control legends and the electrical standard for your country are confirmed before the build starts.

  4. Build, run-off and inspection

    Machine is tested under load. Join over video, or nominate an inspection agency — either is normal here.

  5. Shipment and commissioning

    FOB, CIF or door delivery from Shanghai, Ningbo, Shenzhen, Qingdao or Guangzhou, with installation support once it lands.

Machine assembly and inspection floor in China

One company across manufacturing, supply and export

We are a compact service provider for equipment making, supplying and exporting. Food processors, military instruments, automobile equipment and much more sit on the same production line, which is why a mixed container is straightforward for us and awkward for a trader.

Because the company that builds the machine also ships it, there is one point of contact from the quotation through to the bill of lading — and one company answerable if something needs fixing.

Read about the company

Where our machines land

Regular consignments out of five Chinese ports, with door delivery available in most markets.

  • United Arab Emirates
  • Saudi Arabia
  • Oman
  • Qatar
  • Nigeria
  • Kenya
  • Ghana
  • South Africa
  • Bangladesh
  • Sri Lanka
  • Philippines
  • Vietnam
  • Indonesia
  • United Kingdom
  • Germany
  • Italy
  • Brazil
  • Chile
  • Australia
  • United States

Before the first order

What importers ask us most often, answered plainly.

One unit for most machines — you do not need a container to start. Hand tools, spares and accessories usually start at one carton, and a mixed container across categories is fine for a first order.

Yes. Tell us the supply at your site — 220V or 380V, 50Hz or 60Hz, single or three phase — and the machine is wired to it. Control-panel legends can be printed in your language.

Stock models leave in 7 to 15 days. A machine built to your specification takes 25 to 45 days depending on size and finish. Sea freight from Shanghai, Ningbo, Shenzhen, Qingdao or Guangzhou then runs 14 to 40 days to most ports.

Yes, and we recommend it. Every unit is run under load before crating. You can attend, join over video, or nominate SGS, BV, Intertek or your own agent. The run-off report goes out with the documents either way.

Installation drawings and a wear-part list ship with the machine, and commissioning is supported over video. Standard motors, bearings and contactors are specified so local replacements fit. Warranty terms are confirmed in writing on the proforma invoice.

Send the model code or a description with your throughput, voltage and destination port. That is usually enough for a firm quotation with crated dimensions and weight the same working day.

Send a model number, a drawing, or just a description

Tell us the machine and the output you need. You get a price, lead time, packing details and port options back — usually the same working day.

  • Same working day
  • OEM welcome
  • Any major port